柔性智能位移计在高土石坝变形监测中的应用研究

  

  • 出版日期:2026-09-25 发布日期:2026-09-25

Deformation monitoring of high rockfill dams using flexible intelligent displacement meters

  • Online:2026-09-25 Published:2026-09-25

摘要: 针对传统内部沉降监测设备难以满足300米级高土石坝对耐水压、高精度、大量程及数智化的需求这一技术难题,在测量原理和性能上改进了传统柔性测斜仪,并提出了一种基于柔性智能位移计的高土石坝内部高精度分布式变形测量方法。首先介绍了监测系统组成和安装部署方法,然后推导了考虑软管弯曲与拉伸、测点滑动误差修正的柔性智能位移计测量原理,随后通过试验验证了柔性智能位移计的耐水压能力、角度测量精度和位移测量精度,进而成功应用于四川阿坝州双江口心墙堆石坝。试验结果表明,柔性智能位移计的耐水压达4.5 MPa,角度精度优于0.005°,50 m长测线精度测试中柔性智能位移计与电子水准仪的高程测量曲线在全量程范围内基本重合,变化趋势完全一致。在双江口心墙堆石坝2370高程横河向安装两支柔性智能位移计进行搭接区域相互验证,搭接验证区的MAE介于5.74 ~ 12.96 mm之间,RMSE介于6.75 ~ 13.76 mm之间,MAPE均不超过2%,表明两支位移计的相对偏差极小;进一步选取相邻安装的3个电磁沉降环与柔性智能位移计进行数据对比,结果显示两套监测系统的变形趋势一致。研究表明基于柔性智能位移计的变形测量方法可有效监测高土石坝内部沉降,是一种具有良好应用前景的分布式变形监测技术。

关键词: 土石坝, 沉降, 变形, 三轴加速度计, 误差修正

Abstract: Conventional internal settlement monitoring instruments are difficult to meet the requirements of a 300-meter-high rockfill dam in terms of water-pressure resistance, high accuracy, large measurement range, and digital intelligence. To address the technical challenge, this study improves the traditional flexible inclinometer in the measurement principle and performance, and develops a high-accuracy method for measuring distributed internal deformation in high rockfill dams based on a flexible intelligent displacement meter. We first discuss its system configuration and installation scheme, and then derive its measurement principle, incorporating correction methods for the systematic errors induced by its flexible hose bending and stretching and the gauge point sliding. For this novel device, laboratory tests are conducted to verify its water-pressure resistance, angular measurement accuracy, and displacement measurement accuracy. The method achieved a success in its application to the Shuangjiangkou central core rockfill dam in Aba Prefecture, Sichuan, China. The results show the device withstands water pressure up to 4.5 MPa and achieves an angular accuracy higher than 0.005°. Over a 50 m long gauge line, the elevation profiles measured agree well with the electronic level measurements across the full measurement range, both fully consistent in deformation trends. At elevation 2370 m of this dam, two flexible intelligent displacement meters are installed along the cross-river direction, for mutual verification in the overlapping zone. By the measurements, MAE is in the range of 5.74 - 12.96 mm, RMSE in 6.75 - 13.76 mm, and MAPE does not exceed 2%, indicating negligible relative deviation between the two meters. Further comparison with three adjacent electromagnetic settlement rings confirms both following consistent deformation trends. This study demonstrates that the deformation measurement method based on the flexible intelligent displacement meter is an effective monitoring of the internal settlement in high rockfill dams, and it represents a distributed deformation monitoring technology with promising application prospect.

Key words: rockfill dam, settlement, deformation, triaxial accelerometer, error correction