水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2026, Vol. 45 ›› Issue (9): 1-13.doi: 10.11660/slfdxb.20260901

• •    下一篇

编辑部推荐论文:考虑台风路径预报的水库渐进式汛期运行水位动态控制

  

  • 出版日期:2026-09-25 发布日期:2026-09-25

Incorporating typhoon track and precipitation forecasts for progressive dynamic control of reservoir stages during flood seasons

  • Online:2026-09-25 Published:2026-09-25

摘要: 水库汛期运行水位动态控制能够有效提高洪水资源利用效率。然而,现有动态控制方案通常将各类气象预报转换为入库流量,尚缺乏直接利用多类型气象预报的方法,特别是预警时间长、易形成洪水的台风。为此,本文提出了一种基于台风路径和降水预报的渐进式水库水位动态控制方法。首先将降水事件按成因分类;然后确定各类降水事件的控制级数和阈值;最终利用历史数据模拟调度,确定各类降水的各级动态控制水位及预泄流量。以浙江宁波皎口水库为实例,提出了渐进式水位动态控制方案:在预报台风距离大于1200 km时,按满发流量预泄;距离385 ~ 1200 km时,预泄至62.6 m;距离小于385 km时,预泄至汛限水位60.18 m。研究结果表明:所提方案较实际调度方案增加的蓄水量约为年计划供水量的4.6%,较传统动态控制方案减少弃水量31%。研究可为综合利用台风路径和降水预报的水库汛期运行水位动态控制提供科技支撑。

关键词: 水库, 动态控制, 渐进式, 台风路径, 预蓄预泄, 洪水资源

Abstract: Dynamic control of reservoir stage during flood seasons facilitates efficient water resources utilization. However, the existing dynamic control strategies typically convert meteorological forecasts into reservoir inflow conditions, and few make direct use of these forecasts of different types, particularly for the typhoon events forecasted with longer lead time. This paper describes a progressive dynamic control method that uses the forecast data of typhoon and precipitation events for a better reservoir stage control. First, we classify the precipitation events based on their underlying causes, and determine the control thresholds for each precipitation type. Then, we determine the multi-stage dynamic control water levels through historical data simulations for different precipitation types. In a case study of the Jiaokou reservoir in Ningbo, Zhejiang, China, a progressive dynamic control scheme is derived as follows. Prerelease is done at an outflow for the maximum power output if the forecasted typhoon distance exceeds 1200 km; It continues until the stage of 62.6 m is reached if the distance is in the range of 385-1200 km; It further continues up to the flood limited water level (60.18 m) if the distance is less than 385 km. Results indicate that this scheme increases average water storage by a volume equivalent to 4.6% of the annual water supply compared to historical operations, and reduces spilled water by 31% relative to conventional dynamic control. Thus, this study demonstrates the benefit of dynamic control based on the typhoon track and precipitation forecasts.

Key words: reservoir, dynamic control, progressive, typhoon tracks, prefill and prerelease, floodwater resources

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn