水力发电学报
          Home  |  About Journal  |  Editorial Board  |  Instruction  |  Download  |  Contact Us  |  Ethics policy  |  News  |  中文
  Office Online
  Included Databases

The journal is included in the following databases:
(i)Scopus,
(ii)The Chinese Science Citation Database Source Journals,
(iii)The Chinese Science Journal Abstract Database,
(iv)The Chinese Science and Technology Papers Statistics and Analysis Database,
(v)China Newspaper Subscription Guide Information Database,
(vi)Chinese Academic Journals (CD).

 
2014 Vol. 33, No. 5
Published: 25 October 2014

 
     
1 China's hydropower status in 2013
HAN Dong,FANG Hongwei,YAN Bingzhong,et al
2014 Vol. 33 (5): 1-5 [Abstract] ( 171 ) PDF (609 KB)  ( 699 )
6 Monthly runoff simulation in Gan river basin using rainfall TRMM 3B43V7
HU Qingfang, YANG Dawen, WANG Yintang,et al
2014 Vol. 33 (5): 6-12 [Abstract] ( 218 ) PDF (704 KB)  ( 333 )
13 Study on flood forecasting method based on GFS precipitation forecasting information
YU Hao,YUAN Jingxuan,LU Di,et al
2014 Vol. 33 (5): 13-19 [Abstract] ( 194 ) PDF (587 KB)  ( 317 )
20 Evaluation of future water resources in Jinhua river basin based on bias correction
MA Chong, GAO Xicao, XU Yueping,et al
2014 Vol. 33 (5): 20-27 [Abstract] ( 201 ) PDF (1212 KB)  ( 390 )
28 Routing affects of channel width models on Muskingum-Cunge method
ZHONG Xiangning,ZHOU Maichun,LIU Yuan,et al
2014 Vol. 33 (5): 28-35 [Abstract] ( 222 ) PDF (1182 KB)  ( 367 )
36 Study on method for estimation of dynamic control bounds of flood limited water level in cascade reservoirs
ZHONG Pingan,KONG Yan,WANG Xudan,et al
2014 Vol. 33 (5): 36-43 [Abstract] ( 178 ) PDF (865 KB)  ( 298 )
44 A simple and practical approach to reservoir flood routing through a new numerical-analytical formula
LIAO Xiaolong, CHEN Junxian, ZHU Yifeng,et al
2014 Vol. 33 (5): 44-47 [Abstract] ( 167 ) PDF (412 KB)  ( 402 )
48 Study on risk estimation and its accuracy in early warning system of reservoir water-supply dispatching
WAN Fang, YUAN Wenlin, HUANG Wenzheng,et al
2014 Vol. 33 (5): 48-55 [Abstract] ( 158 ) PDF (467 KB)  ( 248 )
56 Study on short-term optimal scheduling of cascade hydropower stations with power constraint
XU Gang,ZHAO Xiaowei
2014 Vol. 33 (5): 56-62 [Abstract] ( 136 ) PDF (549 KB)  ( 307 )
63   Application of self-adaptive chaos whole annealing genetic algorithm to optimal operation of hydropower station groups
WANG Sen, CHENG Chuntian, WU Xinyu, et al
2014 Vol. 33 (5): 63-71 [Abstract] ( 153 ) PDF (636 KB)  ( 337 )
72 Risk analysis for dam group of cascade reservoirs based on current hydropower industry standards
XU Jiacheng, DU Jingcan, ZHOU Jiacong,et al
2014 Vol. 33 (5): 72-76 [Abstract] ( 161 ) PDF (329 KB)  ( 283 )
77 Estimation of runoff calculation parameters in Xinanjiang model based on remote sensing information
YUAN Di, SONG Xingyuan, ZHANG Yanjun,et al
2014 Vol. 33 (5): 77-85 [Abstract] ( 152 ) PDF (1071 KB)  ( 367 )
86 Recent variations of reach-scale bankfull channel geometry in the braided reache of lower Yellow River
LI Xiaojuan, XIA Junqiang, ZHANG Xiaolei,et al
2014 Vol. 33 (5): 86-92 [Abstract] ( 122 ) PDF (593 KB)  ( 248 )
93 Numerical simulation on Y-shape flaring piers and stepped spillway combined with flow field
ZHANG Qiuyue, FENG Yuan, ZHANG Luo,et al
2014 Vol. 33 (5): 93-98 [Abstract] ( 185 ) PDF (960 KB)  ( 221 )
99 Numerical simulation of dam-break water flow with complex boundary based on governing equations modification
YE Yuntao, LIANG Lili, ZHANG Guanghui,et al
2014 Vol. 33 (5): 99-107 [Abstract] ( 173 ) PDF (1223 KB)  ( 346 )
108 3-D numerical simulation of impacts of flow and sediment regime changes on fluvial processes in conceptual channel
JIA Dongdong, SHAO Xuejun, ZHOU Jianyin,et al
2014 Vol. 33 (5): 108-113 [Abstract] ( 182 ) PDF (1479 KB)  ( 292 )
114 Dynamics mechanism analysis and process of sediment-hyperconcentrated flood routing
DOU Shentang, ZHANG Yuanfeng, YU Xin,et al
2014 Vol. 33 (5): 114-119 [Abstract] ( 206 ) PDF (434 KB)  ( 396 )
120 Calculation of conjugate depths and length of jump on corrugated beds of stilling basin
ZHANG Zhichang, FU Minghuan, LI Ruobing
2014 Vol. 33 (5): 120-127 [Abstract] ( 181 ) PDF (416 KB)  ( 259 )
128 Spatial-temporal variation of methane source and sink from the representative reservoir over Qingjiang river basin
ZHAO Dengzhong, CHENG Xuejun, WANG Zhaohui,et al
2014 Vol. 33 (5): 128-137 [Abstract] ( 153 ) PDF (9187 KB)  ( 85 )
138 Construction and application of an indicator system for assessmentof river ecosystem in plain tributary networks
CHU Kejian, KAN Lijing, HUA Zulin,et al
2014 Vol. 33 (5): 138-144 [Abstract] ( 171 ) PDF (1070 KB)  ( 378 )
145 Model tests and numerical simulation on hydraulic characteristics of level rotary flow in spillway tunnel with blocking and diffuser. I
LI Qilong, NIU Zhengming, GE Chen,et al
2014 Vol. 33 (5): 145-151 [Abstract] ( 179 ) PDF (1738 KB)  ( 211 )
152 Necessity and feasible way of studying true fracture parameters of super-high arch dam concrete
GUAN Junfeng, LI Qingbin, WU Zhimin,et al
2014 Vol. 33 (5): 152-158 [Abstract] ( 128 ) PDF (1993 KB)  ( 251 )
159 Stress evaluation on lining concrete of Xiaolangdi sediment flushing tunnel during operation period
SUI Chun-e, KANG Jingfu
2014 Vol. 33 (5): 159-164 [Abstract] ( 147 ) PDF (639 KB)  ( 315 )
165 Study on waterstop arrangements of transverse joints of hydropower house in river channel
LI Shouyi, XIAO Jing
2014 Vol. 33 (5): 165-168 [Abstract] ( 216 ) PDF (454 KB)  ( 246 )
169 Modeling of long-term behavior of concrete dams affected by alkali-aggregate reaction
PAN Jianwen, XU Yanjie, JIN Feng,et al
2014 Vol. 33 (5): 169-176 [Abstract] ( 190 ) PDF (1821 KB)  ( 450 )
177 Wear-resistant performance of reinforcing hydraulic concrete with igneous rock fiber
GAO Yanhong, ZHU Yandong, FU Zhaoqi,et al
2014 Vol. 33 (5): 177-186 [Abstract] ( 171 ) PDF (1221 KB)  ( 256 )
187 Experimental study of spray polyurea elastomer on dam face seepage engineering
LI Jianbo,LI Bingqi,YANG Jie
2014 Vol. 33 (5): 187-191 [Abstract] ( 132 ) PDF (835 KB)  ( 364 )
192 Effect of geometric parameters of blade on operating scopes of Kaplan turbine
ZHAO Yaping, LIAO Weili, RUAN Hui,et al
2014 Vol. 33 (5): 192-197 [Abstract] ( 141 ) PDF (1303 KB)  ( 344 )
198 Numerical study on high efficiency S-shaped shaft extension tubular pump system
LIU Chao, YANG Fan, JIN Yan,et al
2014 Vol. 33 (5): 198-203 [Abstract] ( 129 ) PDF (1600 KB)  ( 360 )
204 Analysis on unsteady turbulence characteristics of large-scale volute mixed-flow pump system
YANG Fan, TANG Fangping, LIU Chao,et al
2014 Vol. 33 (5): 204-210 [Abstract] ( 146 ) PDF (1418 KB)  ( 435 )
211 Study on effects of wear-rings clearance modifications on performance of centrifugal pump
ZHAO Weiguo,WU Guoxiu,LI Yibing,et al
2014 Vol. 33 (5): 211-215 [Abstract] ( 192 ) PDF (1080 KB)  ( 297 )
216 Fault diagnosis based on improved D-S evidential theory for hydroelectric generator units
CHENG Jiatang,AI Li,DUAN Zhimei,et al
2014 Vol. 33 (5): 216-220 [Abstract] ( 87 ) PDF (372 KB)  ( 192 )
221 Numerical simulation of buoy system in floating and pendular-type wave energy converter
QU Quanyou,HE Hongzhou,ZHANG Jun,et al
2014 Vol. 33 (5): 221-227 [Abstract] ( 135 ) PDF (1429 KB)  ( 279 )
228 Critical success factors in international hydropower contract project management
CHEN Wenchao, QIANG Maoshan, LIN Zhenghang
2014 Vol. 33 (5): 228-234 [Abstract] ( 151 ) PDF (420 KB)  ( 329 )
Copyright © Editorial Board of Journal of Hydroelectric Engineering
Supported by:Beijing Magtech