JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2014, Vol. 33 ›› Issue (5): 56-62.
Previous Articles Next Articles
Online:
Published:
XU Gang,ZHAO Xiaowei. Study on short-term optimal scheduling of cascade hydropower stations with power constraint[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2014, 33(5): 56-62.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/
http://www.slfdxb.cn/EN/Y2014/V33/I5/56
Cited