水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2020, Vol. 39 ›› Issue (8): 69-78.doi: 10.11660/slfdxb.20200807

• • 上一篇    下一篇

我国水电的发展与能源革命电力转型

  

  • 出版日期:2020-08-25 发布日期:2020-08-25

Hydropower development, electric power transformation and energy revolution in China

  • Online:2020-08-25 Published:2020-08-25

摘要: 对于能源革命电力转型,全世界几乎都公认:最突出标志之一是“煤电退役”。然而,长期以来我国对这个问题却始终存在着巨大分歧。由于国内舆论长期被煤电利益共同体操控,以至于我国的公众普遍以为:中国超低排放的煤电技术已经先进到了排放水平低于气电。所以,中国不必退役煤电,也能兑现巴黎协定。不过,最近发布的《加快中国燃煤电厂退出》报告则披露:中国如要兑现巴黎协定,必须要在2040到2055年前退役国内的所有煤电。对此,笔者作为水电工作者,深知发展水电对电力转型之重要,因此,本文将用我国多次为电力转型而做准备的水电规划都曾因未能开启电力转型而落空的历史经验和教训,论述我国水电发展及电力转型的重要性和可行性。

关键词: 巴黎协定, 能源革命, 电力转型, 水力发电, 煤电退役, 超低排放

Abstract: For energy revolution and power transformation, nearly all the countries have recognized one of the most prominent symbols is the retirement of the coal power plants. However, for a long time in China, huge divides existed on this issue. The domestic public opinion had long been dominated by a strong coal community of interests, and a widespread public thought was held in China–the ultra-low coal emission technology has advanced to a level of coal power plant emission lower than gas power plant emission. In such a view, China could deliver on the Paris Agreement without coal power retirement. However, a recently released report, A high ambition coal phaseout in China: feasible strategies through a comprehensive plant-by-plant assessment, revealed that China must retire all the coal power plants by the years of 2040-2055 if the Paris Agreement is to be fulfilled. The author, working on hydropower for decades, well understands the importance of hydropower in power transformation. This paper discusses the importance and feasibility of hydropower development and power transformation in China, reviewing the historical experiences and lessons in the previous hydropower planning that was prepared for power transformation but failed to be implemented.

Key words: Paris Agreement, energy revolution, power transformation, coal power retirement, ultra-low emissions of power

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn