水力发电学报 ›› 2016, Vol. 35 ›› Issue (4): 108-116.doi: 10.11660/slfdxb.20160413
• 水力发电学报 • 上一篇 下一篇
出版日期:
发布日期:
Online:
Published:
Abstract: This study has developed two-layer linear models using a method of progressively deleting insignificant explanatory variables based on the initial explanatory variables specified and by applying the principles of hierarchical linear model and quantitative theory, and analyzed the factors that influence the penetration rates of double-shield tunnel boring machines (TBM) using the in-situ data of tunnel No. 9 of the Tao River diversion project phase I. We also quantitatively describe the direct and indirect impacts by these factors, using model parameter estimates for the fixed effects of each explanatory variable in the models; based on these estimates, suggestions for better TBM operation are put forward. The results indicate that our method is feasible in prediction of the tunneling penetration rates, and it would be useful for forecasting the construction progress and control management in similar projects.
许健,延艳彬,胡晓琳,陆丽娟. 双护盾TBM掘进速度的影响因素研究[J]. 水力发电学报, 2016, 35(4): 108-116.
XU Jian,YAN Yanbin, HU Xiaolin, LU Lijuan. Analysis of influencing factors on penetration rates of double-shield tunnel boring machine[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2016, 35(4): 108-116.
0 / / 推荐
导出引用管理器 EndNote|Reference Manager|ProCite|BibTeX|RefWorks
链接本文: http://www.slfdxb.cn/CN/10.11660/slfdxb.20160413
http://www.slfdxb.cn/CN/Y2016/V35/I4/108
Cited