[1] |
JIAO Yang, LEI Huimin, YANG Dawen, YANG Hanbo. Attribution of discharge changes over Wuding River watershed using a distributed eco-hydrological model[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2017, 36(7): 34
-44
. |
[2] |
XU Wei, PENG Yong. Optimal operation of cascade reservoir hydropower generation based on precipitation forecasts[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2016, 35(7): 23
-33
. |
[3] |
SHI Yajun, PENG Yong, XU Wei. Optimal operation model of cascade reservoirs based on grey discrete differential dynamic programming[J]. JOURNAL OF HYDROELECTRIC ENGINEERING, 2016, 35(12): 35
-44
. |
[4] |
WANG Zhengrong, HAN Juntai, YANG Yuting . Coupled uncertainty of flash flood forecasting method and its application[J]. Journal of Hydroelectric Engineering, 2023, 42(6): 30
-39
. |
[5] |
QIN Jun, LI Sheng, HUA Yongli, SHENG Shiyong, CAI Lei, YU Yunyan. Analysis on flood warning rainfall for railroad bridges and culverts in Gaotai overflow area[J]. Journal of Hydroelectric Engineering, 2022, 41(4): 71
-82
. |
[6] |
ZHANG Wei, ZHENG Yalian, LIU Zhiwu, LIU Pan, LI Mengjie. Deep learning model guided by physical mechanism for reservoir operation[J]. Journal of Hydroelectric Engineering, 2023, 42(3): 13
-25
. |
[7] |
LI Jianzhu, LI Leijing, ZHANG Ting, KANG Yanfu, ZHANG Bo, FENG Ping. Effect of DEM data sources and resolutions on watershed flood simulations[J]. Journal of Hydroelectric Engineering, 2023, 42(3): 26
-40
. |
[8] |
YIN Shiming, XU Wei, XIONG Yicheng, TIAN Yuanyang, ZHAO Siqi, CHEN Si. Hydrological model based on long short-term memory neural network and transfer learning[J]. Journal of Hydroelectric Engineering, 2022, 41(6): 53
-64
. |
|