JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2015, Vol. 34 ›› Issue (2): 189-194.
Previous Articles Next Articles
Online:
Published:
Abstract: A calculation model for hydro plant peaking capacity under reservoir anti-regulation was developed on the basis of previous assessment criteria of the peaking capacity to provide a guide for peaking operation of yearly regulation reservoirs and higher generation benefits under time-of-use (TOU) power price. In application of this model to the cascade hydro plants on Blackwater River, the peaking capacity of the Maoergai hydro plant was evaluated in the conditions of implementing an anti-regulation at the Seergu hydro plant and a second anti-regulation at the Liuping hydro plant. This simulation indicates that the anti-regulation scheme efficiently improves utilization of water power resource and hydro plant benefits and the model proves to be reasonable and applicable.
LI Jidong, HUANG Weibin,et al . Study on peaking capacity of cascade hydropower stations under reservoir anti-regulation[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(2): 189-194.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/
http://www.slfdxb.cn/EN/Y2015/V34/I2/189
Cited