JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2015, Vol. 34 ›› Issue (2): 181-188.
Previous Articles Next Articles
Online:
Published:
Abstract: Upstream flow control is an effective way to allocate downstream diversion risk in construction of cascade hydropower stations. Aiming at evaluation on the benefit of upstream flow control measure, this study systematically examines the generation benefit of upstream stations and the downstream stations under construction influenced by operation transformation in these upstream stations, focusing on the upstream stations and the downstream construction diversion. We explore the impact of flow control on diversion standards, construction progress, and flood safety, from a perspective of the construction diversion system and by comparison with that in free discharge condition. With consideration of all these effects, comprehensive benefits of the upstream flow control measure are calculated, and economic feasibility of a diversion risk distribution method with upstream flow control is quantitatively evaluated according to cost and benefit by taking loss in power generation as costs of flow control and selecting benefit-cost ratio as evaluation criteria. Anumerical example of risk analysis shows that the method is feasible and effective.
CHEN Shu, HU Zhigen. Evaluation on benefits of construction diversion under upstream flow control[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(2): 181-188.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/
http://www.slfdxb.cn/EN/Y2015/V34/I2/181
Cited