JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2015, Vol. 34 ›› Issue (2): 112-117.
Previous Articles Next Articles
Online:
Published:
Abstract: The Changheba hydropower station is typical of high head and large capacity of multi-tunnel combined discharge with flip-bucket energy dissipaters that require a great capacity of the downstream river channel in energy dissipation and anti-scour. Large-scale hydraulic model tests have been conducted to solve the problems of insufficient energy dissipation and poor condition of nappes plunging into river at the initial stage. For slit-bucket and constant-width flip bucket, we compared their effects of energy dissipation and anti-scour on the second spillway in the conditions of individual operation and combined operation, and verified the advantages of combined slit-bucket and flip bucket for multi-tunnel combined operation. The results are useful for design of similar energy dissipation and anti-scour structures.
ZHANG Yingying, WANG Junxing. Study on application of slit-bucket energy dissipater to multi-tunnel combined spillways[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2015, 34(2): 112-117.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/
http://www.slfdxb.cn/EN/Y2015/V34/I2/112
Cited