水力发电学报
          Home  |  About Journal  |  Editorial Board  |  Instruction  |  Download  |  Contact Us  |  Ethics policy  |  News  |  中文

JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2015, Vol. 34 ›› Issue (2): 112-117.

Previous Articles     Next Articles

Study on application of slit-bucket energy dissipater to multi-tunnel combined spillways

  

  • Online:2015-02-25 Published:2015-02-25

Abstract: The Changheba hydropower station is typical of high head and large capacity of multi-tunnel
combined discharge with flip-bucket energy dissipaters that require a great capacity of the downstream river
channel in energy dissipation and anti-scour. Large-scale hydraulic model tests have been conducted to solve
the problems of insufficient energy dissipation and poor condition of nappes plunging into river at the initial
stage. For slit-bucket and constant-width flip bucket, we compared their effects of energy dissipation and
anti-scour on the second spillway in the conditions of individual operation and combined operation, and
verified the advantages of combined slit-bucket and flip bucket for multi-tunnel combined operation. The
results are useful for design of similar energy dissipation and anti-scour structures.

Copyright © Editorial Board of Journal of Hydroelectric Engineering
Supported by:Beijing Magtech