水力发电学报
            首 页   |   期刊介绍   |   编委会   |   投稿须知   |   下载中心   |   联系我们   |   学术规范   |   编辑部公告   |   English

水力发电学报 ›› 2025, Vol. 44 ›› Issue (11): 66-80.doi: 10.11660/slfdxb.20251107

• • 上一篇    下一篇

土石方调配道路运输系统AnyLogic仿真优化研究

  

  • 出版日期:2025-11-25 发布日期:2025-11-25

Study on AnyLogic simulation optimization of road transportation system for earthwork allocation

  • Online:2025-11-25 Published:2025-11-25

摘要: 土石方调配是水电工程项目建设的关键环节,直接影响施工成本和效益。为优化调配方案并提高机械利用效率,提出了一种基于原始-对偶内点法与AnyLogic耦合的土石方调配道路运输系统优化方法。首先,以调配费用最小化为目标,综合考虑挖填进度、场地规划等约束条件,构建土石方动态调配模型;其次,针对水电工程复杂的道路运输条件,运用AnyLogic仿真平台基于排队论建立道路运输系统仿真模型,并采用原始-对偶内点法对土石方动态调配模型进行求解,以获得最优调配方案;在此基础上,将土石方动态调配模型与AnyLogic仿真模型进行耦合,通过多智能体仿真技术,模拟施工机械在运输过程中的动态交互,实现数据动态可视化反馈,从而动态调整机械配置方案,提高机械利用效率。将本文方法应用于具体工程实践,结果表明:该方法能有效降低土石方调配成本,使工程总费用降低7.3%;同时提高了机械协同作业效率,使供料区和受料区的综合上坝率分别提升至84.0%和86.7%;大部分反铲挖掘机利用率超过60.0%,自卸汽车利用率达到95.0%以上,为土石方调配方案决策提供了有力支持。

关键词: 土石方调配, 原始-对偶内点法, AnyLogic, 道路运输系统, 仿真模型

Abstract: Earthwork allocation is crucial to hydropower project construction, posing a direct effect on its cost and efficiency. To optimize allocation strategies and machinery utilization efficiency, this study develops a new optimization method for improving earthwork allocation and road transportation systems based on the coupling of the primal-dual interior point method and AnyLogic. First, a dynamic earthwork allocation model is formulated to minimize allocation costs while considering constraints such as excavation and filling schedules and site planning. Then, we develop an AnyLogic-based road transportation system simulation model using queuing theory, focusing on the complicated road transportation conditions in hydropower projects. And the interior point method is adopted to solve the dynamic earthwork allocation model for an optimal allocation scheme. Finally, we couple these two models and apply a multi-agent simulation technique to simulate the dynamic interaction of construction machinery in transit, so that we can achieve visualization of the real-time data and feedback. This facilitates dynamic adjustment for machinery allocation, thereby improving machinery utilization efficiency. Application in a practical engineering case shows this method is effective in lowering earthwork allocation cost, achieving a project cost reduction by 7.3%. It also increases machinery coordination efficiency, achieving an increase of 84.0% and 86.7% in the comprehensive embankment placement rates of the supply and receiving zones respectively. By adopting the optimal allocation scheme, the machinery utilization rate exceeds 60.0% of most of the backhoe excavators, and 95.0% of the dump trucks. These studies are useful for decision-making in earthwork allocation planning.

Key words: earthwork allocation, primal-dual interior point method, AnyLogic, road transportation system, simulation model

京ICP备13015787号-3
版权所有 © 2013《水力发电学报》编辑部
编辑部地址:中国北京清华大学水电工程系 邮政编码:100084 电话:010-62783813
本系统由北京玛格泰克科技发展有限公司设计开发  技术支持:support@magtech.com.cn