JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2014, Vol. 33 ›› Issue (6): 274-282.
Previous Articles Next Articles
Online:
Published:
Abstract: Traditional schedule risk analysis methods often neglect the effects of two correlations between risk factors and between activities, and they are unable to analyze risk sensitivity of a project and its activities. A schedule risk analysis method considering these two kinds of correlations is presented herein. This method focuses on risk factor states and considers the interaction between correlated risk factors, and it calculates the distribution of project duration through stochastic modeling of risk factor states. To analyze schedule risk, a simulation program named C-NETSIMU of the new method has been coded with C# and its application to a project case is demonstrated. The calculations are compared with those by PERT and Monte Carlo techniques, which verifies the new method and shows the effects of the two correlations.
WANG Renchao, TIAN Yu, CHEN Jianyou . Study on schedule risk analysis method considering two kinds of correlations[J].JOURNAL OF HYDROELECTRIC ENGINEERING, 2014, 33(6): 274-282.
0 / / Recommend
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
URL: http://www.slfdxb.cn/EN/
http://www.slfdxb.cn/EN/Y2014/V33/I6/274
Cited