水力发电学报
          Home  |  About Journal  |  Editorial Board  |  Instruction  |  Download  |  Contact Us  |  Ethics policy  |  News  |  中文

JOURNAL OF HYDROELECTRIC ENGINEERING ›› 2014, Vol. 33 ›› Issue (3): 317-323.

Previous Articles     Next Articles

Decision-making analysis framework for application of lump-sum contracting to hydropower projects from value-added perspective

  

  • Online:2014-06-25 Published:2014-06-25
Copyright © Editorial Board of Journal of Hydroelectric Engineering
Supported by:Beijing Magtech